---
title: Ratul Puri Highlights Plan to Deploy 300 MWp Solar and 300 MWh Storage as Hindustan Power Wins SECI Project with 150 MW Contracting Capacity
description: Ratul Puri shared Hindustan Power’s latest clean energy plans after winning a key SECI project. The company aims to deploy 300 MWp solar capacity along with 300 MWh battery storage to support India’s growing renewable energy transition.
image: https://ratulpuri.blog/hubfs/ratul%20puri%20(11)-1.jpeg
---

[Skip to content](https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity#main-content)

[![https://ratulpuri.blog/en-in/](https://ratulpuri.blog/hs-fs/hubfs/Hindustan%20Power%20pdf_page-0001.jpg?width=3572&height=1081&name=Hindustan%20Power%20pdf_page-0001.jpg)](https://hindustanpower.in/)

- [Home](https://ratulpuri.blog/en-in/)
- [Gallery](https://ratulpuri.blog/gallery)
- [Blog](https://ratulpuri.blog/)
- [About](https://ratulpuri.blog/about)

Open main navigation

Close main navigation

- [Home](https://ratulpuri.blog/en-in/)
- [Gallery](https://ratulpuri.blog/gallery)
- [Blog](https://ratulpuri.blog/)
- [About](https://ratulpuri.blog/about)
- [Contact us](https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity#contact)

[Contact us](https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity#contact)

 May 26, 2026, 7:24:19 AM

# Ratul Puri Highlights Plan to Deploy 300 MWp Solar and 300 MWh Storage as Hindustan Power Wins SECI Project with 150 MW Contracting Capacity

[Ratul Puri](https://ratulpuri.blog/author/ratul-puri)

Share: [facebook-f icon](http://www.facebook.com/share.php?u=https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity) [linkedin-in icon](http://www.linkedin.com/shareArticle?mini=true&url=https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity) [Twitter icon](https://twitter.com/intent/tweet?url=https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity) [pinterest-p icon](http://pinterest.com/pin/create/link/?url=https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity) [envelope icon](mailto:?body=https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity)

![Ratul Puri, Chairman of Hindustan Power, during a corporate executive portrait focused on India’s renewable energy sector.](https://ratulpuri.blog/hs-fs/hubfs/ratul%20puri%20(11).jpeg?width=1376&height=917&name=ratul%20puri%20(11).jpeg) 

[**Hindustan Power**](https://hindustanpower.in/), one of India’s leading integrated energy companies, has won a bid from the Solar Energy Corporation of India (SECI) to develop a solar and battery energy storage project with a contracted capacity of 150 MW of solar power. The project will require the installation of approximately 300 MWp of solar capacity and 300 MWh of Battery Energy Storage Systems (BESS). Shaping India’s next phase of clean-energy growth, [**Chairman Ratul Puri**](https://www.instagram.com/ratulpuri_official/) emphasized company’s focus on building flexible, storage-led renewable assets that will define the country’s future power infrastructure. The project will be developed under the ‘SECI–ISTS–XX’ tender. It is designed for flexible deployment and can be set up at suitable locations across India. It was secured through a tariff-based competitive bidding process, followed by a successful e-Reverse Auction (e-RA) conducted on the ETS portal. It was awarded under SECI’s tender for ISTS-connected Solar PV projects with integrated Battery Energy Storage Systems (BESS).  

 [**Hindustan Power**](https://hindustanpower.in/), one of India’s leading integrated energy companies, has won a bid from the Solar Energy Corporation of India (SECI) to develop a solar and battery energy storage project with a contracted capacity of 150 MW of solar power. The project will require the installation of approximately 300 MWp of solar capacity and 300 MWh of Battery Energy Storage Systems (BESS). Shaping India’s next phase of clean-energy growth, [**Chairman Ratul Puri**](https://www.instagram.com/ratulpuri_official/) emphasized company’s focus on building flexible, storage-led renewable assets that will define the country’s future power infrastructure. The project will be developed under the ‘SECI–ISTS–XX’ tender. It is designed for flexible deployment and can be set up at suitable locations across India. It was secured through a tariff-based competitive bidding process, followed by a successful e-Reverse Auction (e-RA) conducted on the ETS portal. It was awarded under SECI’s tender for ISTS-connected Solar PV projects with integrated Battery Energy Storage Systems (BESS).  

![Business portrait of Ratul Puri highlighting leadership in solar energy and sustainable infrastructure development.](https://ratulpuri.blog/hs-fs/hubfs/ratul%20puri%20(10).jpeg?width=917&height=1376&name=ratul%20puri%20(10).jpeg)

Commenting on the development, Mr [**Ratul Puri, Chairman, Hindustan Power**](https://ratulpuri.blog/ratul-puri-led-hindustan-power-signs-power-supply-agreement-with-mp-power-management-company-limited-for-supply-of-800-mw-power), said: “*This project reflects our continuous commitment to advancing India’s transition toward a modern, flexible and future-ready energy ecosystem. Our focus remains on building assets that deliver stability and efficiency, as we continue to build future-ready energy infrastructure that supports India’s clean-energy ambitions*.” This development marks another step forward in Hindustan Power’s efforts to strengthen its renewable energy portfolio and contribute to India’s clean energy goals. The integration of solar generation with battery storage will enable enhanced grid reliability, improved power management during peak hours, and a more stable supply of clean energy.

![Ratul Puri at Hindustan Power office discussing clean energy expansion and SECI solar projects in India.](https://ratulpuri.blog/hs-fs/hubfs/ratul%20puri.jpg?width=1280&height=1920&name=ratul%20puri.jpg)

By combining solar power with advanced storage, [**Hindustan Power**](https://m.thewire.in/article/ptiprnews/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity/amp) continues to support national goals for sustainability, energy security, and the delivery of clean power. The company is currently developing clean-energy projects across various parts of India. It is commissioning a 435 MW solar project in Uttar Pradesh, a 100 MW solar power plant along with a state-of-the-art 100 MW battery-energy storage system in Assam, and a 120 MWh battery-storage project in Bihar. The company has also secured a new contract from SJVN Limited to build a 100 MW solar project paired with a 200 MWh battery-storage system. Together, these projects reflect Hindustan Power’s commitment to expanding India’s clean-energy footprint.

 

**About Ratul Puri**

[**Ratul Puri**](https://ratulpuri2.website3.me/) is the Chairman of Hindustan Power, an integrated power generation company with a strong presence in renewable and transitional energy. Over the years, he has been involved in the development of large-scale energy infrastructure projects that support India’s growing power requirements and its transition toward cleaner energy sources

 

**About Hindustan Power**

[**Hindustan Power**](https://www.outlookbusiness.com/spotlight/news-wire/ratul-puri-led-hindustan-power-signs-power-supply-agreement-with-mp-power-management-company-limited-for-supply-of-800-mw-power) is an integrated power generation company focused on renewable and transitional energy. The company has been actively contributing to India’s energy transformation through the development of solar power and other energy infrastructure projects.

[ratul puri](https://ratulpuri.blog/tag/ratul-puri), [hindustan power](https://ratulpuri.blog/tag/hindustan-power), [ratul puri's](https://ratulpuri.blog/tag/ratul-puris), [Ratul Puri Achievements](https://ratulpuri.blog/tag/ratul-puri-achievements), [ratul puri bio](https://ratulpuri.blog/tag/ratul-puri-bio), [ratul puri wiki](https://ratulpuri.blog/tag/ratul-puri-wiki), [ratul puri company](https://ratulpuri.blog/tag/ratul-puri-company), [ratul puri web](https://ratulpuri.blog/tag/ratul-puri-web), [ratul puri contacts](https://ratulpuri.blog/tag/ratul-puri-contacts)

 

 

 

 

## Related posts

[![Ratul Puri during an interview on India's renewable energy future.](https://ratulpuri.blog/hs-fs/hubfs/Ratul%20Puri%20(10)%20(1)-1.png?height=200&name=Ratul%20Puri%20(10)%20(1)-1.png)](https://ratulpuri.blog/mr.-ratul-puri-chairman-hindustan-power-said-we-are-focused-on-building-energy-systems-that-combine-generation-storage-flexibility-and-reliability)

[ratul puri](https://ratulpuri.blog/tag/ratul-puri), [hindustan power](https://ratulpuri.blog/tag/hindustan-power), [ratul puri's](https://ratulpuri.blog/tag/ratul-puris), [ratul puri bio](https://ratulpuri.blog/tag/ratul-puri-bio), [ratul puri wiki](https://ratulpuri.blog/tag/ratul-puri-wiki), [ratul puri company](https://ratulpuri.blog/tag/ratul-puri-company), [ratul puri web](https://ratulpuri.blog/tag/ratul-puri-web), [ratul puri contacts](https://ratulpuri.blog/tag/ratul-puri-contacts)

## [Mr. Ratul Puri, Chairman, Hindustan Power, said, “We are focused on building energy systems that combine generation, storage, flexibility and reliability”](https://ratulpuri.blog/mr.-ratul-puri-chairman-hindustan-power-said-we-are-focused-on-building-energy-systems-that-combine-generation-storage-flexibility-and-reliability)

[Ratul Puri](https://ratulpuri.blog/author/ratul-puri) 

 Jul 10, 2026, 6:23:44 AM

Q 1. Hindustan Power has been a pioneer in India’s renewable energy sector. Can you take us through...

[Read more](https://ratulpuri.blog/mr.-ratul-puri-chairman-hindustan-power-said-we-are-focused-on-building-energy-systems-that-combine-generation-storage-flexibility-and-reliability)

[![Hindustan Power solar project Punjab Ratul Puri renewable energy project India PSPCL](https://ratulpuri.blog/hs-fs/hubfs/Ratul-Puri-Chairman-of-Hindustan-Power.jpg?height=200&name=Ratul-Puri-Chairman-of-Hindustan-Power.jpg)](https://ratulpuri.blog/ratul-puri-led-hindustan-power-secures-150-mwp-solar-project-in-punjab)

[ratul puri](https://ratulpuri.blog/tag/ratul-puri), [ratul puri's](https://ratulpuri.blog/tag/ratul-puris), [Ratul Puri’s Key Achievements](https://ratulpuri.blog/tag/ratul-puris-key-achievements), [Ratul Puri Achievements](https://ratulpuri.blog/tag/ratul-puri-achievements), [Hindustan Powerprojects](https://ratulpuri.blog/tag/hindustan-powerprojects), [ratul puri bio](https://ratulpuri.blog/tag/ratul-puri-bio), [ratul puri wiki](https://ratulpuri.blog/tag/ratul-puri-wiki), [ratul puri company](https://ratulpuri.blog/tag/ratul-puri-company), [ratul puri web](https://ratulpuri.blog/tag/ratul-puri-web)

## [Ratul Puri-led Hindustan Power secures 150 MWp solar project in Punjab](https://ratulpuri.blog/ratul-puri-led-hindustan-power-secures-150-mwp-solar-project-in-punjab)

[Ratul Puri](https://ratulpuri.blog/author/ratul-puri) 

 Apr 28, 2026, 7:17:56 AM

Hindustan Power, an integrated energy company in India, has secured a 100 MW AC solar power project...

[Read more](https://ratulpuri.blog/ratul-puri-led-hindustan-power-secures-150-mwp-solar-project-in-punjab)

[![Ratul Puri discussing the importance of battery storage for India's solar energy future.](https://ratulpuri.blog/hs-fs/hubfs/ratul%20puri%20(25).jpeg?height=200&name=ratul%20puri%20(25).jpeg)](https://ratulpuri.blog/doing-solar-without-battery-makes-limited-sense-says-ratul-puri-chairman-hindustan-power)

[chairman hindustan power](https://ratulpuri.blog/tag/chairman-hindustan-power), [ratul puri](https://ratulpuri.blog/tag/ratul-puri), [hindustan power](https://ratulpuri.blog/tag/hindustan-power), [ratul puri's](https://ratulpuri.blog/tag/ratul-puris), [Ratul Puri’s Key Achievements](https://ratulpuri.blog/tag/ratul-puris-key-achievements), [Ratul Puri Achievements](https://ratulpuri.blog/tag/ratul-puri-achievements), [ratul puri bio](https://ratulpuri.blog/tag/ratul-puri-bio), [ratul puri wiki](https://ratulpuri.blog/tag/ratul-puri-wiki), [ratul puri company](https://ratulpuri.blog/tag/ratul-puri-company), [ratul puri web](https://ratulpuri.blog/tag/ratul-puri-web), [ratul puri contacts](https://ratulpuri.blog/tag/ratul-puri-contacts)

## ["Doing Solar Without Battery Makes Limited Sense", Says Ratul Puri, Chairman, Hindustan Power](https://ratulpuri.blog/doing-solar-without-battery-makes-limited-sense-says-ratul-puri-chairman-hindustan-power)

[Ratul Puri](https://ratulpuri.blog/author/ratul-puri) 

 Jul 4, 2026, 7:25:17 AM

"I'm a strong believer in distributed generation. India is blessed with a high degree of solar...

[Read more](https://ratulpuri.blog/doing-solar-without-battery-makes-limited-sense-says-ratul-puri-chairman-hindustan-power)

[X Twitter icon](https://x.com/puri_ratul) [link icon](https://www.business-standard.com/content/press-releases-ani/ratul-puri-highlights-hindustan-power-s-efforts-to-combat-water-scarcity-in-uttar-pradesh-124112900341_1.html) [link icon](https://ratulpuri.in/) [instagram icon](https://www.instagram.com/ratulpuri_official/) [Follow us on Facebook](https://www.facebook.com/puriratul) [Follow us on Facebook](https://www.linkedin.com/in/ratul-puri-5b168a245/) [Follow us on Facebook](https://www.youtube.com/@Puri_Ratul) [Follow us on Facebook](https://in.pinterest.com/puri_ratul/) [Follow us on Facebook](https://www.crunchbase.com/person/ratul-puri) [Follow us on Facebook](https://substack.com/@ratulpuri) [Follow us on Facebook](https://www.threads.com/@ratulpuri_official)

- [Home](https://ratulpuri.blog/en-in/)
- [Gallery](https://ratulpuri.blog/gallery)
- [Blog](https://ratulpuri.blog)
- [About](https://ratulpuri.blog/about)

---

[![Hindustan Power logo](https://ratulpuri.blog/hs-fs/hubfs/Untitled%20design-1.png?width=224&height=38&name=Untitled%20design-1.png "Hindustan Power logo")](https://hindustanpower.in/)

Copyright © 2026,

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Ratul Puri",
    "url" : "https://ratulpuri.blog/author/ratul-puri"
  },
  "dateModified" : "2026-05-26T11:29:21.103Z",
  "datePublished" : "2026-05-26T11:24:19.000Z",
  "headline" : "Ratul Puri Highlights Plan to Deploy 300 MWp Solar and 300 MWh Storage as Hindustan Power Wins SECI Project with 150 MW Contracting Capacity",
  "image" : [ "https://ratulpuri.blog/hubfs/ratul%20puri%20(11)-1.jpeg" ],
  "mainEntityOfPage" : {
    "@id" : "https://ratulpuri.blog/ratul-puri-highlights-plan-to-deploy-300-mwp-solar-and-300-mwh-storage-as-hindustan-power-wins-seci-project-with-150-mw-contracting-capacity",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject"
    }
  }
}
```